FFloorJob costing
On this deviceSync
$75.00/h
The job
A name or a job number so you can find it next week. Status is for you — nothing is sent to a client.

Status

$

Optional. We'll tell you if it's a donation.

Profit target
Margin on the whole job — profit divided by what you charge, not by cost. 30% margin is not 30% markup. The pad later is a missed-cost buffer, not this.
%

Least you should charge to keep 30% on this job: $1,042.07. The pad total is what you type into invoicing. This number is the job floor.

Crew
Crew on this job. Paycheck wage is not the cost. True hourly cost is.

Custom rates for this job

$75.00 you charge·$52.00 true cost·$32.00 paycheck

Rate book

Paycheck wage

$32.00

Hits the bank. Not the cost.

True hourly cost

$52.00

What this hour actually costs you.

You charge

$75.00

What the client pays per man-h.

True hourly cost is paycheck wage plus EI, CPP, WCB, vacation, benefits, and the truck. The floor uses that number, not the wage on the stub. On this job that gap is $240.00 — paycheck labor $384.00, true labor $624.00.

What is true hourly cost?

People say “loaded wage” and mean this. If you only price the paycheck, you donate payroll tax, time off, benefits, and the van. Company burden on a $32.00/h wage:

Paycheck wage
$32.00
CPP / EI / WSIB (14.1%)
$4.52
Vacation / stat (6%)
$1.92
Benefits (8%)
$2.56
Truck / overhead per hour
$8.00
Built true cost
$49.00

This job is using $52.00/h, not the builder’s $49.00/h. Fix it on Rates if that is wrong.

$

What you bill the client.

$

Paycheck plus payroll, time off, benefits, truck.

$

What hits the bank. Not the cost.

Hours
Hours each hand is on site, not a pool. Three crew for eight hours is twenty-four hours.

Regular labor at true cost

$624.00

Paycheck would say $384.00. Gap $240.00.

No overtime. Add a block if anyone stays late — 1.5× is the company default.

Travel
Type distance from the office. Gas and the vehicle live in Settings.

Company fuel

$0.29 /km

Van · $1.65/L · 12.5 L/100km = $0.21 fuel + $0.08 wear

Set gas
km

Office to site. One way.

Round trip

Counted both ways

68 km

$19.45

Fuel line

Fuel line: $19.45.

Off. If anyone sleeps there, turn it on.

Off. Crews eat. You pay or they resent you.

Materials / equipment
Cost in, then a markup. Markup on parts is profit.
$
%

Cost $86.00 → sell $98.90. Book markup is 25%. This line is light.

Did you forget this?
Mark N/A when it truly does not apply. Blank lines will keep showing up. That is the point.
  • Fuel

    Round trip. You have to come home.

    Counted in travel. Do not double it here.

  • Hotel

    If anyone sleeps there, it is a line.

  • Food / per-diem

    Crew eat. You pay or they keep the receipt forever.

  • Parking

    Downtown jobs eat cash like it is nothing.

  • Permits

    If you need one and did not price it, that is a donation.

  • Dump fees

    Debris leaves in a truck. Dump fees belong on the sheet.

  • Small tools

    Bits, blades, bags, consumables. They add up while you are not looking.

  • Wear

    Equipment does not last forever. Charge like you know that.

  • Weather delay

    Price one rain day. Just one. Or eat it later.

  • Second trip

    Did you price the second trip?

  • PM time

    Someone has to run this job. That someone is not free.

  • Warranty

    Callbacks are a cost. Pretending they are a personality trait does not help.

  • Tax

    If you owe it, it is in the number. Not after.

  • Insurance bump

    One claim and you will wish this line existed.

Missed-cost pad
Not profit. A buffer for what you missed on this job — dump, tools, warranty, the second trip. Profit is labor spread plus material markup.
%

5% small and known. 10% usual. 20% when you're guessing.

I'd add 20%. You're guessing. 20% pad, or go price the blank checklist lines.

Labor at $75.00/h

Charge rate × hours. The spread vs true hourly cost is profit on the job.

$900.00

Materials / equipment

At the markup you picked. That markup is also profit on the job.

$98.90

Travel

Fuel, hotel, per-diem — actual cost.

$19.45

Subtotal

$1,018.35

Known extras not on those lines

None priced. Blank checklist lines are uncertainty — that's why the pad exists.

$0.00

10% pad

$101.83

Pad left after extras

Leftover pad is leftover buffer. It is not the profit you planned.

$101.83

Profit on this job

$390.73

Labor spread $276.00 + material markup $12.90 + leftover pad $101.83. The pad is a buffer. This number is the job.

At 20% the work + pad is $1,222.02. Tap that chip if you agree.

How Floor works — pad vs profit vs the job floor.

Collect

$1,252.57

3 lines · 10% pad