Floor
Floor · field
Office 12 weekend patch · 1847
Not a proposal. Fill quantities and notes. Send it back.
Rates and margin are locked from the office. Change hours, distance, quantities, and the checklist. If a number is missing, write a note — do not guess a charge rate.
Locked from office
- Margin target
- 30%
- Charge rate
- $75.00/h
- True hourly cost
- $52.00/h
- Fuel
- $0.29/km
Round trip is on. Hotel off. Per-diem off. Change those in the office job if the site disagrees.
Materials — cost in, quantity. Markup is locked.
- $
Checklist — N/A, open, or a dollar
Fuel
Round trip. You have to come home.
Hotel
If anyone sleeps there, it is a line.
Food / per-diem
Crew eat. You pay or they keep the receipt forever.
Parking
Downtown jobs eat cash like it is nothing.
Permits
If you need one and did not price it, that is a donation.
Dump fees
Debris leaves in a truck. Dump fees belong on the sheet.
Small tools
Bits, blades, bags, consumables. They add up while you are not looking.
Wear
Equipment does not last forever. Charge like you know that.
Weather delay
Price one rain day. Just one. Or eat it later.
Second trip
Did you price the second trip?
PM time
Someone has to run this job. That someone is not free.
Warranty
Callbacks are a cost. Pretending they are a personality trait does not help.
Tax
If you owe it, it is in the number. Not after.
Insurance bump
One claim and you will wish this line existed.
Photo of the sheet
If they filled paper, snap it. Saved on this device with the job.