FFloorJob costing
On this deviceSync
$75.00/h

Floor

Compare

Same lines, two jobs. If one floor is wildly lower, a line is missing.

LinePlant 4 lighting upgrade · 1842Office 12 weekend patch · 1847
Collect$12,019.94$1,252.57
Work + pad$10,099.44$1,120.18
Job floor$9,785.99$1,042.07
True cost$6,850.19$729.45
Target margin30%30%
Charge rate$85.00/h$75.00/h
People32
Rate-card total$9,772.31$1,018.35
If labor at cost$8,563.31$742.35
Shortfall$1,222.68$299.72
Labor (true cost)$2,106.00$624.00
Labor at paycheck$1,248.00$384.00
Travel$169.19$19.45
Materials cost$3,984.00$86.00
Materials sell$5,697.12$98.90
Extras$591.00$0.00
Open checklist19
Missed-cost pad (chosen)10%10%
Pad Floor would pick15%20%
Profit on this job$3,249.25$390.73
Planned number$9,800.00$1,400.00