Floor · internal breakdown

Plant 4 lighting upgrade · 1842

Electrical

Collect

$12,019.94

Internal — not a proposal

Night work. Two lifts. They will want it cheaper. Do not.

Type these lines

Labor$3,315.00
Materials / equipment$5,697.12
Travel$169.19
Dump fees$75.00
Small tools$40.00
Wear$120.00
PM time$81.00
Warranty$180.00
Insurance bump$95.00
Subtotal$9,772.31
HST 13%$1,270.40
Admin pad 10%$977.23
Collect$12,019.94

This job

True cost$6,850.19
Target margin 30%$2,935.80
Job floor$9,785.99
If labor at cost + material markups$8,563.31
Rate-card total (labor billed)$9,772.31
Gap vs floor (labor at cost)$1,222.68
Missed-cost pad 10%I'd go 15%
Planned number$9,800.00

Missed-cost pad

Buffer on labor + materials + travel. Not profit. Profit on this job is labor spread plus material markup.

Labor at charge rate$3,315.00
Materials / equipment$5,697.12
Travel$169.19
Subtotal$9,181.31
Known extras$591.00
Pad chosen 10%$918.13
Pad Floor would pick15%
Work + pad$10,099.44
Collect (with tax)$12,019.94
Labor spread$1,209.00
Material markup$1,713.12
Pad left after extras$327.13
Profit on this job$3,249.25

You've priced $591 of extras and the second trip is still open. 15%, not 10%.

Labor

3 crew · paycheck $32.00/h · true cost $54.00/h · charge $85.00/man-h · custom

Regular 10h each$1,620.00
1.5× · 3 × 2h$486.00
True labor cost$2,106.00
Labor billed$3,315.00

Travel

172 km round trip$49.19
Hotel$0.00
Per-diem / food$120.00

Materials / equipment

LineCostSell
High-bay LED fixtures43% markup$3,552.00$5,079.36
Whips + connectors43% markup$432.00$617.76

Still to price

  • Second trip — Did you price the second trip?
  • N/A: Hotel
  • N/A: Parking
  • N/A: Permits
  • N/A: Weather delay
  • N/A: Tax

Internal — not a proposal · Sep 7